Experience & applied work

Energy models, operating tools and field results.

Explore energy modeling, systems integration, and field experience relevant to owner decisions, with the scope and setting of each contribution made explicit.

Attribution note

HelioVector work and Ray Zhang's prior-role contributions are distinguished below. Project settings describe contributions within wider teams. Project capacity is context for the work, not an asset ownership or end-to-end EPC delivery claim. The 2.2% performance result relates to one plant and is not a portfolio-wide guarantee.

01 / Analytical work

What Ray built, tested and delivered.

Each case identifies the setting and the work performed, distinguishing development analysis, system concepts, prototype work, and validated operating results.

01HelioVector · Feb 2026 – present

From site MW to dependable IT capacity

Ray built capacity waterfalls for mining-site conversions and powered-land concepts. He compared utility-only, solar plus storage, and bridge power in Python, crossing two tenant load ramps with two energization schedules. He tested lifecycle cost, NPV, IRR and delivery risk against the dates when firm power would be available.

12 modeled scenarios · 3 supply paths × 2 ramps × 2 schedulesTry a separate capacity example →
02WiseGlow (ThunderSoft Energy) · Apr 2025 – Jan 2026

Underwriting a 20 MW Alberta solar development with storage

Ray built the Python-assisted PPA versus merchant underwriting for Camrose. He tested capture price, curtailment, battery duration and degradation, costs and construction timing. His broader work at WiseGlow included evaluating PPA, ESA and service structures across a mixed-stage 100+ MW opportunity set. Finance, Legal, Procurement, engineering and EPC partners used common assumptions and risk registers to prepare go/no-go reviews.

Development diligence · contract comparison and investment reviewTry a buyer-side contract example →
03ThunderSoft · Jun 2024 – Mar 2025

Defining the operating envelope of an AI data center

Ray modeled rapid workload ramps and reduced battery support against server power, cooling limits, reserve and utility supply. He specified telemetry, APIs, alarms, manual overrides and acceptance criteria for power capping and battery dispatch. The work defined a path from simulation to controlled testing; protection stayed with local equipment.

Scenario modeling · data contracts · validation design
04Lingyang Technology · Oct 2020 – May 2024

Getting operating data into the field

Ray built and deployed Python and Excel analytics and digital-twin dashboards for O&M and asset-management users at more than ten PV sites. Combining weather, tracker angle, generation and alarms helped teams distinguish equipment faults from operating conditions. At one 50 MW plant, he validated a 2.2% generation uplift.

Field-deployed dashboards · one-plant performance result
05HelioVector · Feb 2026 – present

Testing a bid-review prototype on EPC and OEM packages

Ray designed a prototype that pairs source-cited language-model extraction with deterministic Python checks for units, warranty exclusions and schedule gaps. Across 30 documents in six bid packages, median first-pass review time per package fell by at least 25% in testing. Reviewers retained responsibility for interpreting exceptions.

Prototype test · 8 risk categories · 50+ checkpoints
06ExodusPoint Capital Management · Jan 2018 – Sep 2020

Building reproducible market-risk pipelines

Ray transformed market and alternative data into model-ready indicators in Python. Out-of-sample tests, sensitivity analysis and monitoring helped the team see when data quality or a market regime changed. Outputs supported portfolio stress tests and capital-allocation discussions.

Quantitative research · forecast validation · tail risk

02 / Project settings

Representative project delivery experience.

The case studies illustrate the interfaces that govern outcomes: technical requirements, suppliers, logistics, construction, controls, testing, and owner acceptance.

30 MW utility-scale solar PV project in Cordoba, Colombia
Cordoba, Colombia30 MW

Utility-scale PV

Technical and commercial coordination within a wider project team

Core challenge

Cross-border procurement and delivery across international suppliers, local construction, and owner requirements.

Representative controls
  • Equipment specification alignment
  • Multi-vendor bid normalization
  • Logistics and EPC interfaces
  • Milestone and acceptance readiness
50 MW utility-scale solar project in Resko, Poland
Resko, Poland50 MW

Utility-scale PV

Supplier governance within a cross-border delivery team

Core challenge

Coordinating manufacturing quality, European logistics, grid requirements, and construction milestones.

Representative controls
  • Factory and quality surveillance
  • Multi-origin logistics planning
  • Technical compliance review
  • Variance and milestone tracking
Commercial rooftop solar installations in Italy and Germany
Italy & Germany2 MW

Rooftop PV portfolio

Technical specification and procurement support

Core challenge

Maintaining a consistent technical and quality approach across multiple sites with different local constraints.

Representative controls
  • Standardized specifications
  • Central procurement support
  • Distributed-site quality protocols
  • Commissioning and verification

Selected prior-role experience Ray Zhang · Lingyang Technology · Oct 2020–May 2024

10+PV sites supported with analytics and digital-twin dashboards
30+projects supported through intelligent tracker controls
1+ GWproject capacity represented across those deployments
2.2%generation uplift validated at one 50 MW solar plant

03 / Delivery approach

Maintain continuity from analysis to verification.

01

Translate across disciplines

Align owners, utilities, engineers, EPCs, suppliers, controls teams, finance, procurement, and executives around one decision basis.

02

Assign risk and accountability

Convert uncertainty into documented assumptions, accountable actions, decision gates, and traceable change control.

03

Verify the promised outcome

Carry requirements through design reviews, FAT / SAT, commissioning, acceptance, performance testing, and handover.

Start with the decision

Need continuity from strategy through delivery?

01 / Your asset02 / Your decision03 / Your timeline

Discuss a decision study, an analytical workstream, or owner-side advisory. A useful starting point is the asset, the decision, and the date it needs to be made.

ray@heliovector.ai New Jersey / New York · Working across North America